Things are cookin’ along. I have installed all 10 of the tortoise switch machines in lower / North staging (5 on each end). All but two are wired in and powered via the DS64’s. The last two are going to be powered via a “Wabbitt“. At the moment I have one [...]

Golden Spike! 1st Meet!

Tuesday, February 10th, 2009

Monday night was an historic night on the ICG. We ran trains from opposing staging yards and had our first meet! Several other trains were run as well. While not error free, we did have a good time and resulted in a good test run of the track and rolling start. [...]